Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
Package Boilers - Babcock & Wilc
Package Boilers - Babcock & Wilcox
B&W’s line of industrial package boilers represents more than 150 years of ingenuity and experience, providing dependable performance for a wide range of industries and applications. Over the years, our industrial boiler configurations have been known by various model names, including FM, HCFM, PFM, PFI, PFT, TSSG ® and others — D-type or
Get A Quote
F]Miscellaneous Industrial Costs - Michig
[PDF]
Miscellaneous Industrial Costs - Michigan
Costs are for gas- and light-oil-fired boilers, complete with pumps, controls and gauges, 15 pounds pressure for steam, 30 pounds for water. Costs do not include flue piping, electric wiring, pad, gas or oil piping. Add 12% for 125# water pressure, 25% for 150# steam. For heavy-oil- and combination oil- and gas-fired units, add 15%.
Get A Quote