Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>Biomass ventures in Thailand - PUGNATORI
Biomass ventures in Thailand - PUGNATORIUS
Status quo: Thailand’s electricity production by biogas is reported with MW 1,959.95 in 2012, MW 2,320.78 in 2013, MW 2,451.82 in 2014, MW 2.812 in 2016. The values for heat-generating are ktoe 4,346.00 in 2012, ktoe 4,694.00 in 2013 and ktoe 5,144.00 in 2014. In the year 2014, biomass as renewable energy had the highest share of heat production (89% of the thermal energy produced from …
Get A Quote